1-30-2014
1-28-2014
MIDDLE BRAKE HANGER INSTALLED NOW TO DRILL FOR PIN, ALSO GOT ALL THE BRAKE SHOE RODS MADE ON BOTH ENDS AND NOW TO PUT THEM IN THE MILL AND MACHINE DOWN THE MIDDLE FOR THE CLEVIS. SLOW GOING WITH SHOCKS TO CATCH UP AND CARS STILL TO FIX BUT I AM GETTING THERE I AM GETTING PARTS AND PIECES DAILY TO KEEP ME GOING WITH LITTLE PROJECTS.
1-27-2014
FOUR BRAKE RODS WITH ONE END DONE ON ALL THEM TAKES ABOUT 25 MINUTES, ALSO I HAVE MATERIALS CUT FOR THE BOILER MOUNTING AND THEN ALSO THE MIDDLE BRAKE HANGER. THIS WEEK LOOKS TO BE A PRODUCTIVE WEEK PARTS ARE COMING IN AND THE BOILER IS STARTED AND SHOULD BE HERE MID FEB.
1-24-2014
1-5-2014
JAN 1-3-2014